Energy Monitoring System EnMos - Swisscom
Summary
For Swisscom, Tetrag realised the implementation of an energy monitoring system for 67 data centres and central offices as a total contractor. This included concept development, planning, installation of the meters and system integration.
The project
The sites were checked for their existing measurement infrastructure and expanded. New data sources were developed and interfaces to other leading systems had to be created.
Services in detail
- Development of the measurement and system concept as total contractor
- Planning and implementation of the rollout
- Installation of the meter infrastructure
- System integration
Challenges
- Implementation during ongoing operations
- Completion of installations at 67 locations within 12 months
- Consideration of frozen zones. During these important periods for Swisscom, during public events (e.g. Olympic Games, WEF Davos, etc.), no adjustments were allowed to be made to the system technology.
- High security requirements regarding access and data communication
Sustainability
- Creation of transparency regarding energy consumption
- Increase energy efficiency by 20% from 2009 to 2015
Further information
Our goals
- Creation of transparency regarding energy consumption
- Determination of the PUE
- Increased operational reliability through timely expansion of supply capacity
- Increasing energy efficiency